Tailor-made technical components
We bring your plastic, rubber or hybrid product to life, from concept to production, with full control ensured by our in-house production process in Belgium.
A dynamic and flexible family-run business with over 60 years’ expertise in moulds and injection moulding
As specialists in the manufacturing of technical components made from plastic and rubber, we can offer the full service from concept to production. This includes advice during the product development phase, the manufacturing of the required moulds, and series production using our state-of-the-art injection moulding machines.
- Capability to produce small, medium or large batch sizes
- Fast and flexible lead times thanks to our in-house production in Belgium
- Extensive stock of raw materials (PP, PA, POM, ASA, TPR, ABS, PBT, PS, etc.), additives and colourants from reputable suppliers
- Focus on technical components weighing between 5g and 500g for a wide range of applications and sectors
- Option for hybrid components where the metal parts are produced in-house (pressing, stamping, turning and milling)
Our solutions
Design and manufacturing of moulds for the injection moulding of plastic and rubber components.
Series production of plastic and rubber components for a wide range of applications and sectors.
Find your answer here
Frequently Asked Questions (FAQ)
Can we supply our own mould?
We can manufacture moulds in-house, or, if preferred, collaborate with a partner of your choice. Existing moulds can also be used for production on our machines. Should any modifications be required, we are able to carry these out ourselves.
Is there a minimum production quantity required?
Our quotations include a price for the mould and a unit price for the production of the parts. Depending on the type of product, injection moulding can be cost-effective as of few hundred units. This because you need to be able to spread the cost of the mould across a sufficient production volume. In consultation with you, we also offer other techniques for lower production volumes (shared moulds, 3D printing, machining of semi-finished parts, etc.).
What is the lead time for a mould?
The lead time for the development and production of a mould depends heavily on the complexity of the required component. The average lead time from an approved design to the first test injection moulding is typically around 6–8 weeks.
What is the lead time for parts?
The standard lead time for parts is 6 weeks from receipt of an order. This enables us to optimise our production planning and offer competitive prices. As our production takes place in-house in Belgium, we can offer a shorter lead time for rush orders. If required, we can also stock parts so that they can be collected on demand.
Can you also supply parts that require additional processing?
If required, we can also carry out various finishing processes on the manufactured parts to make them fully ready for use. This includes, for example, assembly, printing, machining, etc.